Helen Varga
Leads throughput studies. Former night-shift supervisor in discrete assembly. Stays at the count point through changeovers.
The menu could not be opened on this page. Use the links in the footer instead.
Practice
Deploy Flowcore exists because shift boards keep swallowing changeovers, waits, and hold cages into one number. The practice is on-floor observation first. Written packs come after the crew has seen the ranked list at the line.
The first paid week was a stamping line that “lost two hours every Thursday.” Maintenance had a stack of tickets. Packing had a different count. The missing hours were a shared lift and a late first-off. Nobody needed another monthly percentage. They needed names on the board that matched the aisle.
Correspondence goes through the Alabaster address listed on this site. Plant days happen at the client’s building, under their visitor rules. Georgian commercial law is named in the terms for the written agreement; the floor work still follows the host plant’s lockout and food-contact rules.
One observer, one primary line, a supervisor host, and a dictionary of stop names written before anyone totals a column. We photograph boards only with permission. We do not rewire anything. A local desktop utility may hold the transcribed tallies on a computer that never has to leave the room. That utility is a record book, not a trading product and not a production-control system.
People
Leads throughput studies. Former night-shift supervisor in discrete assembly. Stays at the count point through changeovers.
Quality trend walks. Trained as an inspector, now argues politely with ticket codes that do not match the piece in hand.
Shift-log reconstruction. Turns mixed clipboards into a week the next observer can stand on without renaming stations mid-shift.